HSIP Cycle 11 Pedestrian Improvements Project # 100477
The work includes removing and installing signs, removing and installing pavement markings, installing crosswalks, demolishing existing pavements, demolishing and installing curb, gutter, and sidewalk, installing curb ramps, pavement rehabilitation, installation of a Rectangular Rapid Flashing Beacon (RRFB) system, and traffic control.
Plans
(click to expand/collapse)

Name | Size | ||
Dixon-HSIP-Cycle-11_Plans_250520 | 10.6 MB |