Police Department Firing Range Project

Site Grading, Rehabilitation of existing protective berm, installation of bullet traps, construction of concrete path and covered shade structure, as well as construction of new ballistic wall. The Engineer’s Estimate for this project is $414,000.00.
  Addendum 1 (click to expand/collapse)
Name Size
Dixon PD Firing Range Addendum No.1 97.3 KB
  Addendum 2 (click to expand/collapse)
Name Size
Dixon PD Firing Range Addendum No.2 86.1 KB
  Addendum 3 (click to expand/collapse)
Name Size
Dixon PD Firing Range Addendum No.3 2.0 MB
  Pre-Bid Meeting Sign In (click to expand/collapse)
Name Size
Pre-Bid Meeting Sign-in Sheet 04.16.2021 546.9 KB